All piles are installed by TMR, DTH and Hydraulic Rotary Piling Rig. The works comprises mainly of the following steps:
Sodium based bentonite will be used with pH of Fluid between 9.5 and 11.5. Bentonite powder shall conform to requirements given in IS: 2911 (Part -1/Sec -2). All batches of bentonite powder delivered & suspension fluid made there from shall be tested to satisfy requirements failing which they shall be rejected.
Bentonite powder shall be mixed with clean water to make a suspension of density as specified. The suspension shall be regularly tested to ensure its suitability for use as drilling mud.
WhatsApp us