S. No.
Name of Work
State
Name of Employer
Value of contract
1
Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and up to end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under Phase-A of SARDP-NE”
Assam
Spargo Infra
Rs. 1.49 Crores
2
“Construction of Balance work of Widening, Strengthening and reconstruction of Hazaribagh – Barkagaon – Tandwa – Khelari – Bijupara (SH-7) Road ( including bridges & bypass) in the State of Jharkhand on EPC basis”
Jharkhand
SHAJ
Rs. 0.27 Crores
3
Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018
West Bengal
Kartikey Infra, West Bengal
Rs. 0.78 Crores
4
“Improvement of NH 60 from Km 3300 to km 3550 & from Km 3600 to Km 3740 except the stretch from Km 337.703 to Km 339.046 (for Suri ROB) by way of strengthening of existing carriageway and laying of wearing course from Km 3550 to Km 3600 in the district of Birbhum, West Bengal under EPC mode (Job No. 060-WB-2018- 19/433)”
West Bengal
Kartikey Infra, West Bengal
Rs. 0.35 Crores
5
Strengthening of road from km 73 to 119.175 of NH-100 Under NH(O) on EPC mode in the state of Jharkhand
Jharkhand
Trisha Construction, Road Construction Department, Jharkhand
Rs. 0.15 Crores
6
Design Report for widening and strengthening of Road work and Reconstruction of culverts in Km. 31 to Km 61 (chainage Km.30 to Km. 60.500) oh NH-99 under NH Division Hazaribagh
Jharkhand
Trisha Construction, NH Division, Hazaribagh (Under MGCPL)